NOMINAL INDEX

Marino Dredgeco Limited v. The Board of Trustees of the Port of Kolkata, with connected appeal, 2026 LLBiz SC 356

Rajasthan Rajya Vidyut Utpadan Nigam Ltd. v. Parsa Kente Collieries Ltd., 2026 LLBiz SC 355

Winner Construction Pvt. Ltd. v. Agricultural Produce Marketing Committee, 2026 LLBiz HC (DEL) 1252

Shankar Enterprises & Anr. v. M/s Bihani Manufacturing Private Limited & Anr.; M/s Jagdish Enterprises & Anr. v. M/s Bihani Manufacturing Private Limited, 2026 LLBiz HC (DEL) 1245

Kimti Lall Jain v. Suez Water Technologies and Solution & Ors., 2026 LLBiz HC (DEL) 1265

Janvee Contracts Pvt. Ltd. (JCPL) v. Ahluwalia Contracts (India) Ltd. (ACIL), 2026 LLBiz HC (DEL) 1269

Maytas Subhash v. IRCON International Limited & Anr., 2026 LLBiz HC (DEL) 1244

Rajkumar Theatres Pvt. Ltd. v. Wide Angle Creations and Six Others, 2026 LLBiz HC (MAD) 358

S.N.R. Richlin Vivegha and Another v. S.N.R. Joshva Rathinaraj and Others, 2026 LLBiz HC (MAD) 357

World Alumni Network Pvt. Ltd. v. Rajiv Gandhi University of Health Sciences, 2026 LLBiz HC (KAR) 232

Pragati Metallurgical Services Forging Inspection & Consultant v. The Steel Authority of India Ltd. & Anr., 2026 LLBiz HC (KAR) 242

S.S. Exports v. M/s ARK Shipping Co. Ltd., 2026 LLBiz HC (KAR) 235

Plutus Research Private Limited v. Aashay Harlalka, 2026 LLBiz HC (KAR) 237

Sita Devi v. ACV Explosives LLP & Ors., 2026 LLBiz HC(RAJ) 66

Suma Minerals Private Limited v. Indian Oil Corporation Limited & Others, 2026 LLBiz HC(RAJ) 64

Union of India and Anr. v. R.K. Gupta, 2026 LLBiz HC(MP) 84

Supreme Court 

Arbitral Award Cannot Be Reduced Merely Because Government Entity Has To Pay: Supreme Court

Case Title M/s Marino Dredgeco Limited v. The Board of Trustees of the Port of Kolkata, with connected appeal

Case Number Civil Appeal Nos. 14303 and 14304 of 2026

Citation 2026 LLBiz SC 356

The Supreme Court has held that an arbitral award cannot be reduced merely because the entity liable to pay it is a government body, observing that an award backed by valid evidence cannot be interfered with simply because the amount appears excessive.

A bench of Justice J.B. Pardiwala and Justice K. Vinod Chandran made the observation while restoring an arbitral award in favour of Marino Dredgeco Limited for additional dredging work at Kolkata Port Trust's Sagar Island pilot station.

Relying on the apex court's ruling in Pam Developments Private Ltd. v. State of West Bengal, the top court held,

“There can hence be no interference caused to the quantum of claim decided by the Arbitrator, based on valid material, merely for the reason that the award debtor is a Government entity and that the quantum appears to be excessive without any substantiation for such a ground being raised against the award itself,” the court observed.

Supreme Court Upholds Arbitral Awards In Favour Of Adani-Rajasthan JV In Coal Mining Dispute

Case Title Rajasthan Rajya Vidyut Utpadan Nigam Ltd. v. Parsa Kente Collieries Ltd.

Case Number Special Leave Petition (Civil) No. 32968 of 2026

Citation 2026 LLBiz SC 355

The Supreme Court has upheld arbitral awards in favour of Parsa Kente Collieries Limited (PKCL), a joint venture between Adani Enterprises Limited and Rajasthan government-owned power generation company Rajasthan Rajya Vidyut Utpadan Nigam Limited (RVUNL), in a coal mining dispute involving claims worth over ₹300 crore.

A bench of Justice Nongmeikapam Kotiswar Singh and Justice Satish Chandra Sharma dismissed RVUNL's challenge, holding that the Commercial Court had exceeded the limits of its jurisdiction under Section 34 of the Arbitration and Conciliation Act, 1996, by setting aside the arbitrator's findings on several claims.

“The Arbitral Tribunal is the final arbiter of the facts, and the construction of the contractual terms is primarily its domain. Where the interpretation adopted is a possible and plausible one, the court cannot substitute its own interpretation, however persuasive the alternative reading may be,” the top court ruled.

HIGH COURTS 

Delhi High Court

Mere Omission To Consider Contractual Clause Does Not Make Award Patently Illegal: Delhi High Court

Case Title Winner Construction Pvt. Ltd. v. Agricultural Produce Marketing Committee

Case Number O.M.P. (COMM) 13/2015

Citation 2026 LLBiz HC (DEL) 1252

The Delhi High Court on 3 November held that an arbitral tribunal's failure to separately consider a contractual provision does not, by itself, constitute patent illegality warranting interference under Section 34 of the Arbitration and Conciliation Act, 1996. The omission must go to the root of the award and materially affect its decision.

Justice Om Prakash Shukla dismissed a petition filed by Winner Construction Pvt. Ltd. challenging an arbitral award that rejected its claims for interest on delayed payment of the final bill, cost escalation of labour and materials, and additional establishment expenses arising from a construction contract with the Agricultural Produce Marketing Committee (APMC). The Bench observed:

“In view of the finding that the final running bill had been prepared by the Engineer-in-Charge upon the Petitioner's failure to submit it, the omission to separately discuss Clause 9 does not materially affect the basis of the decision. The omission, therefore, cannot be said to constitute an error going to the root of the impugned Award or render the finding perverse or patently illegal so as to warrant interference under Section 34 of the Act.”

Can Arbitrator Direct Parties To Pay Costs To Tribunal Itself? Delhi High Court Issues Notice

Case Title M/s Shankar Enterprises & Anr. v. M/s Bihani Manufacturing Private Limited & Anr.; M/s Jagdish Enterprises & Anr. v. M/s Bihani Manufacturing Private Limited

Case Number CM(M) 2326/2026 with CM APPL. 73585/2026 and 73586/2026; CM(M) 2327/2026 with CM APPL. 73587/2026 and 73588/2026

Citation 2026 LLBiz HC (DEL) 1245

The Delhi High Court on 27 October issued notice on whether an arbitrator can impose costs payable to the arbitral tribunal itself, while staying the payment of Rs. 50,000 and Rs. 70,000 imposed on two parties for delayed defence filings.

Justice Ajay Digpaul passed the interim order on petitions filed by Shankar Enterprises and Jagdish Enterprises challenging the costs imposed in their respective arbitrations with Bihani Manufacturing Private Limited. The Bench observed:

“Having heard the learned counsel appearing for the petitioners, it is prima facie observed that the aspect of imposition of costs upon the petitioners, which are required to be deposited before the learned Arbitral Tribunal vide impugned orders dated 03.10.2026, and 09.10.2026, warrants consideration by this Court.”

Strong Prima Facie Case Not Enough For Post-Arbitral Award Interim Relief: Delhi High Cour

Case Title Mr Kimti Lall Jain v. Suez Water Technologies and Solution & Ors.

Case Number O.M.P.(I) (COMM.) 354/2026 & I.A. 22929/2026

Citation 2026 LLBiz HC (DEL) 1265

An unsuccessful party in arbitration cannot secure interim protection after an adverse arbitral award merely by establishing a strong prima facie case. It must also demonstrate rare and compelling circumstances warranting such relief, the Delhi High Court has reiterated.

Justice Tushar Rao Gedela, relying on the Supreme Court's ruling in Home Care Retail Marts Pvt. Ltd. v. Haresh N. Sanghavi and the Delhi High Court's decision in Thor Ventures (OPC) Private Limited v. Nyeq Technologies Private Limited, observed:

“Having said that, it is not every case where strong prima facie case as contemplated in Home Care Retail (supra) is made out, that the unsuccessful party is entitled to an interim protection orders under Section 9 of the Act, but only those which fall within the term 'rare and compelling case'.”

Amicable Consultation With Company Chairman Does Not Constitute Arbitration Agreement: Delhi High Court

Case Title Janvee Contracts Pvt Ltd (JCPL) v. Ahluwalia Contracts (India) Ltd. (ACIL)

Case Number ARB.P. 1811/2026 (CNR No. DLHC010485542026)

Citation 2026 LLBiz HC (DEL) 1269

The Delhi High Court on 19 November held that a clause requiring disputes to be resolved amicably in consultation with a company's chairman does not constitute an arbitration agreement, even if it is titled “arbitration” and makes the chairman's decision “final and binding”.

Justice Swarana Kanta Sharma dismissed Janvee Contracts Pvt. Ltd.'s petition seeking appointment of an arbitrator against Ahluwalia Contracts (India) Ltd. in a Rs. 19.30 lakh payment dispute arising from construction work at a medical college in Himachal Pradesh. The Bench observed:

“Though the decision of the Chairman is stated to be 'final and binding', such finality cannot, by itself, convert a non-arbitral dispute resolution mechanism into an arbitration agreement. The nature of the process contemplated by the clause has to be considered, and the process here is one of amicable resolution and consultation, rather than adjudication...”

Vivad Se Vishwas Scheme Applies To State Authorities Procuring Through Central Public Sector Enterprises: Delhi HC

Case Title Maytas Subhash v. IRCON International Limited & Anr.

Case Number W.P.(C) 15607/2024

Citation 2026 LLBiz HC (DEL) 1244

The Delhi High Court has recently held that a State government authority cannot escape the Centre's Vivad Se Vishwas II (Contractual Disputes) scheme, an amnesty scheme, merely because it is not a Central government entity if it routes a contract through a Central Public Sector Enterprise.

The court ruled that the State authority must fund the settlement even though the procurement was undertaken through a Central government entity.

"Once a procurement is done by any public authority (which may not be an instrumentality of the Central Government) through a Central Public Sector Enterprise as enumerated in paragraph 4 of the Scheme, then the scheme in effect is made applicable to such public authority," Justice Amit Mahajan ruled.

The Court also held that the pendency of a challenge to an arbitral award under Section 34 of the Arbitration and Conciliation Act, 1996, does not prevent settlement under the scheme.

"Even the pendency of a challenge under Section 34 of the Arbitration and Conciliation Act, 1996 cannot act as an embargo for the implementation of the scheme as paragraph 10(b) of the Scheme specifically provides that the case may or may not be under challenge/appeal before a Court," the Court observed.

Madras High Court 

Madras High Court Rejects Plea To Restrain OTT Release Of Ajay Devgn-Starrer 'Drishyam 3: The Conclusion'

Case Title Rajkumar Theatres Pvt Ltd v. Wide Angle Creations and six others

Case Number O.A. No. 1114 of 2026 in C.S. (Comm Div) No. 280 of 2026

Citation 2026 LLBiz HC (MAD) 358

The Madras High Court has recently rejected a second attempt by Rajkumar Theatres Private Limited to restrain the further exploitation of Ajay Devgn-starrer Hindi film 'Drishyam: The Conclusion', including its OTT release, holding that an earlier order refusing the same interim relief had attained finality.

Justice P.B. Balaji held that abandoning arbitration and filing a civil suit did not entitle Rajkumar Theatres to renew an injunction request involving the same parties, cause of action and documents, particularly when it had failed to establish a subsisting right warranting protection.

The court observed, "In light of the above, 1stly, the applicant/plaintiff is not entitled to an interim injunction as prayed for, for two reasons: namely, having suffered a dismissal in the Section 9 application, where the very same relief has been sought for, against the very same respondents as well, and the said order dated 01.10.2026 having become final, the applicant/plaintiff cannot and is not entitled to an interim injunction, merely because the applicant/plaintiff has chosen to abandon the arbitration route and has instead filed the present suit wherein the very same interim relief has been renewed."

Madras High Court Sets Aside Sundaram Finance Auction Of Joint Property Over Children's One-Third Share

Case Title S.N.R. Richlin Vivegha and Another v. S.N.R. Joshva Rathinaraj and Others

Case Number C.M.A.(MD) No. 193 of 2025

Citation 2026 LLBiz HC (MAD) 357

The Madras High Court on 12 November allowed an appeal filed by S.N.R. Richlin Vivegha and S.N.R. Julian Joshua, children of borrower S.N.R. Joshva Rathinaraj, against the attachment and court auction sale of their inherited share in a jointly owned property to recover dues owed to Sundaram Finance.

Justice P Murugan held that property jointly owned by a borrower and his deceased wife cannot be attached and sold in execution of an arbitral award without excluding the undivided share inherited by their children, who were not parties to the loan agreement. The Bench observed:

“The first item of properties belongs not only to the first respondent and also the petitioners' mother, who was not signatory to any agreement with the second respondent. Therefore, her share of the property cannot be attached without hearing the said person or her legal heirs.”

Karnataka High Court 

Karnataka High Court Appoints Arbitrator In World Alumni Network's Payment Dispute With RGUHS

Case Title World Alumni Network Pvt Ltd v. Rajiv Gandhi University of Health Sciences

Case Number : Civil Miscellaneous Petition No. 206 of 2025; NC: 2026:KHC:62463

Citation 2026 LLBiz HC (KAR) 232

The Karnataka High Court on 12 November allowed World Alumni Network's application under Section 11(6) of the Arbitration and Conciliation Act, 1996, and appointed former Karnataka High Court judge Justice N. Kumar as sole arbitrator to adjudicate its invoice payment dispute with Rajiv Gandhi University of Health Sciences.

Justice H.T. Narendra Prasad held that issuing two unanswered legal notices seeking negotiations is sufficient to satisfy a contractual precondition for amicable settlement before invoking arbitration. The Bench observed:

“Thus, the petitioner has made sufficient efforts to comply with the pre-condition stipulated under Clause 13 of the Agreement. The respondent, having failed to respond to the petitioner's efforts for amicable settlement, cannot now contend that the petitioner has not fulfilled the said pre-condition.”

Karnataka High Court Rejects Contractor's ₹98.80 Lakh Claim Against SAIL For Revised Minimum Wages

Case Title Pragati Metallurgical Services Forging Inspection & Consultant v. The Steel Authority of India Ltd. & Anr.

Case Number Commercial Appeal No. 202 of 2025 | 2026:KHC:54134-DB

Citation 2026 LLBiz HC (KAR) 242

The Karnataka High Court has upheld an arbitral award rejecting Pragati Metallurgical Services' Rs. 98.80 lakh claim against Steel Authority of India Limited (SAIL) for reimbursement of increased minimum wages paid to workers under a steel finishing contract.

A Division Bench comprising Justices D.K. Singh and H. Shanthi Bhushan held that a contractor's statutory obligation to pay revised minimum wages does not, by itself, create a contractual obligation on the employer to reimburse the additional expenditure. The judges observed:

“The Commercial Court has rightly noticed that the statutory obligation of the petitioner to pay revised wages cannot, by itself, be converted into a contractual obligation on the part of the respondent to reimburse the same. We do not find any perversity in the said reasoning.”

Foreign Award Enforcement Does Not Always Require Separate Board Resolution: Karnataka High Court

Case Title M/s S.S. Exports v. M/s ARK Shipping Co. Ltd.

Case Number Writ Petition No. 21581 of 2026 (GM-CPC)

Citation 2026 LLBiz HC (KAR) 235

The Karnataka High Court on 3 November held that Order III Rule 2 of the Code of Civil Procedure, 1908, does not invariably require a foreign arbitral award-holder to produce a separate board resolution specifically authorising execution proceedings in India, if its representative's authority is established through legally acceptable material.

Justice Lalitha Kanneganti dismissed S.S. Exports' petition challenging the authority of A.Z. Mookhtiar, who represented South Korean company ARK Shipping Co. Ltd. in proceedings to enforce a 2005 Singapore-seated arbitral award, and directed the Bengaluru executing court to conclude the enforcement proceedings within six months. The Bench stated:

“The fact that the proceedings concern a Foreign Arbitral Award does not create an additional statutory obligation under Order III Rule 2 CPC to produce a board resolution specifically authorizing the initiation of execution proceedings in India in every case.”

Pending NCLT Proceeding Does Not Bar Arbitration Of Separate Employment Dispute: Karnataka HC

Case Title Plutus Research Private Limited v. Aashay Harlalka

Case Number Civil Misc. Petition No. 503 of 2025

Citation 2026 LLBiz HC (KAR) 237

The Karnataka High Court has held that proceedings before the NCLT over allegations of fraud, mismanagement, and removal from directorship do not automatically bar arbitration of a separate contractual dispute arising from an employment agreement.

Justice H.T. Narendra Prasad observed that the two proceedings involved distinct legal rights and causes of action, even though they concerned the same parties and might involve overlapping facts.

“The mere existence of common factual circumstances does not necessarily render the causes of action identical. Nor does it follow that an independent contractual dispute becomes non-arbitrable merely because statutory proceedings concerning the affairs of the Company are pending before the NCLT.” the court held

Rajasthan High Court

Arbitration Pleas Cannot Become Mini-Trials Through Routine Cross-Examination: Rajasthan High Court

Case Title Sita Devi v. ACV Explosives LLP & Ors.

Case Number S.B. Civil Writ Petition No. 22200/2026

Citation 2026 LLBiz HC(RAJ) 66

The Rajasthan High Court on 4 November held that questioning the source of statements in an affidavit or disputing their accuracy does not, by itself, warrant cross-examination in proceedings seeking interim protection under Section 9 of the Arbitration and Conciliation Act, 1996.

Justice Anand Sharma allowed a writ petition filed by Sita Devi challenging a Commercial Court order permitting the opposing parties to cross-examine her power-of-attorney holder, who had filed the Section 9 application and sworn the supporting affidavit on her behalf. The Bench said:

“If every objection regarding the source of knowledge of the person verifying an application, or every dispute concerning the correctness of the assertions made therein, is permitted to result in cross-examination, the proceedings may become protracted and lose their very purpose. Such a course would effectively convert an application for interim protection into a mini-trial, which is neither contemplated by Section 9 nor consistent with its object.”

Arbitration Clause Not 'Blanket Protection' To Retain Land After Lease Expiry: Rajasthan High Court

Case Title Suma Minerals Private Limited v. Indian Oil Corporation Limited & Others

Case Number S.B. Civil Writ Petition No. 13951/2024

Citation 2026 LLBiz HC(RAJ) 64

The Rajasthan High Court has held that a public sector corporation cannot use an arbitration clause as a blanket protection to continue occupying private land after expiry of the lease when the landowner has demanded possession.

“In view of the foregoing discussion, this Court is of the considered opinion that the arbitration clause cannot be treated as a blanket protection for Respondent-IOCL to continue occupying the petitioner's land after expiry of the lease,” Justice Anand Sharma ruled.

The court further observed that “a public sector corporation is expected to act fairly, reasonably and in accordance with law. It cannot insist upon retention of private property indefinitely without establishing a subsisting legal entitlement to do so”.

Madhya Pradesh High Court

Party Does Not Waive Right To Seek Arbitration By Being Appointing Authority: MP High Court

Case Title Union of India and Anr. v. R.K. Gupta

Case Number Miscellaneous Appeal No. 416 of 2012

Citation 2026 LLBiz HC(MP) 84

The Madhya Pradesh High Court on 5 November held that a party does not waive its right to invoke arbitration merely because the contract designates it as the authority responsible for appointing the arbitrator or arbitral panel.

Justice Pradeep Mittal dismissed West Central Railway's appeal against the reference of its Rs. 3.98 lakh recovery claim against contractor R.K. Gupta to arbitration. The Bench

“A party does not waive their right to seek arbitration just because they are also the designated authority responsible for appointing the panel or arbitrator..."